CDM 2015 vs the Building Safety Act: Which Duties Apply to You?

Two regimes, overlapping duty-holders, and a lot of confusion. We untangle which set of rules bites on a domestic extension, a commercial fit-out and a higher-risk building.

infodc422810046's avatar

infodc422810046

Two regimes, overlapping duty-holders, and a lot of confusion. We untangle which set of rules bites on a domestic extension, a commercial fit-out and a higher-risk building.

Why this matters

Most projects that overrun did so long before anyone broke ground. Getting this right at the outset is the cheapest risk reduction available to you.

  • Define the scope. An estimate is only accurate for the works it describes, and it is the silence that costs money.
  • Use current rates. Material prices have moved sharply; last year’s figures are not conservative, they are wrong.
  • Allow for risk. Ground conditions, party wall awards and planning conditions all carry cost, and all are knowable in advance.

What good looks like

A professional piece of work should be legible to a non-specialist and defensible to a contractor. If it is not itemised, you cannot meaningfully compare it with anything else.

An estimate is not a prediction of what your project will cost. It is a statement of what a defined scope of work is worth at today’s rates.Sarah Proctor

Next steps

Send us what you have — drawings, sketches or a description — and we will tell you within a day what we can produce.

Placeholder article — replace with the final copy before launch.

All articles

Need a number you can rely on?

Send us your drawings or a description of the works and we’ll come back within one working day.

Request an Estimate

Get a Quote

    We typically respond within one working day.

    Discover more from The UK Group

    Subscribe now to keep reading and get access to the full archive.

    Continue reading